Colombian Foreign Minister, María Ángela Holguín and her Venezuelan counterpart Elías Jaua signed a memorandum of understanding in the name of the NOC of each country, Ecopetrol (NYSE:EC) and PDVSA, to connect oil pipelines at the border.
The mayor’s office of Yopal has scheduled a meeting with 10 area village leaders to discuss roadway needs in areas close to oil production sites in the municipality.
In the last week three successive attacks week have shut down the Caño Limon-Coveñas painting a complicated picture for transport infrastructure in areas where the ELN and Farc operate, and have also stopped Colombian gas exports to Venezuela along a separate pipeline.
Past lowering diluent costs associated with moving heavy crude, Pacific Rubiales Energy (TSX:PRE) acquisition of Petrominerals (TSX:PMG) transportation infrastructure is also a strong point to this deal. The company will form a new subsidiary to manage infrastructure assets and sell a 40%.
Ecopetrol’s (NYSE:EC) oil transportation firm Cenit will increase its investment plan to US$1.4B in 2014 and its president Camilo Marulanda says that daily production in Colombia could reach 1,350,000bod by 2015.
The Bicentennial Pipeline (OBC) says it will be operational sometime in the fourth quarter of 2013, which signifies another delay in the launch of the 960km, up to 150,000 barrels a day transport infrastructure.
Selling a small percentage of Ecopetrol (NYSE:EC) instead of the whole of electrical energy generator Isagén would be preferable for the government to raise money for a needed investment in infrastructure says the VP of Colombia’s Senate, Carlos Emiro Barriga.
Once a proposal surrounding the environmental management plan of the Barrancabermeja refinery is approved by the National Environmental Licensing Agency (ANLA) is passed, Ecopetrol’s (NYSE: EC) board of directors can approve the next step of the project.
Canada’s Pacific Rubiales Energy (PRE:TSX) will invest USD$1B in infrastructure over the next year through its subsidiary Pacific Infrastructure, in projects that include a port, pipeline and train facilities.
The primary problem is that at the main routes out of the Llanos and the Upper Magdalena Valley basin to Barrancabermeja and the Atlantic coast via Bogotá remain blocked. See the complete list of relevant blockages.