
Thursday, November 19th, 2026
Colombia paid US$725.4 million to import natural gas in the third quarter of 2026, up 258.3% from US$202.4 million in the third quarter of 2025, as the country pays abroad for product it no longer produces at home.



Gas pipeline operator TGI reported third-quarter net income of COP$99.9 billion, down 6.8% from a year earlier, as revenue fell 7.5% to COP$466.2 billion on lower industrial demand and a cut in its regulated rate of return.
Ecopetrol’s US shale business in the Permian Basin produced 80,600 boed in the third quarter, down 23.3% from a year earlier and its lowest level in more than two years.
Grupo Energía Bogotá (GEB) is offering Ecopetrol “all the collaboration” to reactivate the pipeline that would carry gas from Venezuela, a line its president, Juan Ricardo Ortega, says could be ready in 12 to 15 months.
Calls to phase out oil and gas soon are unrealistic, argues Amylkar Acosta, a Colombian columnist and former Minister of Mines and Energy, in an opinion column that stresses oil’s role well beyond fuel.
The government of President Abelardo de la Espriella has set a goal of 1 million bd of oil production by 2030 in its draft National Development Plan (PND) for 2026-2030, which also calls for fracking and a recovery of gas output.
Ecopetrol said it obtained an environmental decision that removes an obstacle to its KGG deepwater gas project in the Caribbean, president Joaquín Gutiérrez said on November 13th.