Monday, May 25th, 2026
MinEnergy has published a draft resolution laying out measures to protect natural gas supply and electricity system reliability during the scheduled maintenance of the SPEC LNG regasification terminal in Cartagena, planned for a five-day window between July 30 and August 3, 2026.


President Gustavo Petro launched a wide-ranging attack on Ecopetrol, political opponents, and business sectors in an extended post on X, centering his fire on what he described as the state oil company’s refusal to reduce its gas demand in the face of an accelerating climate crisis.
The first physical components of Colombia’s Pacific Regasification Plant are now in transit, marking a concrete step forward for one of the country’s important gas infrastructure projects.
Juan Gonzalo Castaño Valderrama has resigned from Ecopetrol’s board of directors after just over three months in the role, the latest disruption to the state oil company’s already turbulent governance.
NG Energy International Corp. (“NGE” or the “Company”) announced that it had filed its financial results for the three months ended March 31, 2026.
Arrow Exploration Corp. reported encouraging results from two separate wells on its Tapir Block in Colombia’s Llanos Basin in back-to-back press releases issued May 8 and May 13, 2026, covering an appraisal well at Mateguafa and an exploration well at the newly drilled Icaco prospect.
Ecopetrol set a new operational record in early May when it loaded a 500,000-barrel fuel oil cargo onto a vessel at the Puerto Bahía maritime terminal near Cartagena — double its previous maximum for a single shipment.