
Wednesday, November 18th, 2026
Gas pipeline operator TGI reported third-quarter net income of COP$99.9 billion, down 6.8% from a year earlier, as revenue fell 7.5% to COP$466.2 billion on lower industrial demand and a cut in its regulated rate of return.



The government of President Abelardo de la Espriella has set a goal of 1 million bd of oil production by 2030 in its draft National Development Plan (PND) for 2026-2030, which also calls for fracking and a recovery of gas output.
Ecopetrol said it obtained an environmental decision that removes an obstacle to its KGG deepwater gas project in the Caribbean, president Joaquín Gutiérrez said on November 13th.
Grupo Energía Bogotá (GEB) is offering Ecopetrol “all the collaboration” to reactivate the pipeline that would carry gas from Venezuela, a line its president, Juan Ricardo Ortega, says could be ready in 12 to 15 months.
Magnex, a Colombian industrial maintenance company, has named Venezuela as one of its three initial expansion markets, along with Colombia and Peru, and says consolidating new business there is a priority for 2027.
NG Energy reported record third-quarter gas volumes of 23.2 mmcfd (3,861 boed) net, up 63% from the second quarter, and a corporate price of US$8.59 per Mcf, which turned the after-lease netback positive at US$0.32 per Mcf from a loss of US$0.49 in the second quarter.
Ecopetrol will restart exploration of unconventional resources in Colombia, with a focus on the La Luna formation in the Middle Magdalena Valley, its president, Joaquín Gutiérrez, announced on the November 13th investor call.